• Study Resource
  • Explore
    • Arts & Humanities
    • Business
    • Engineering & Technology
    • Foreign Language
    • History
    • Math
    • Science
    • Social Science

    Top subcategories

    • Advanced Math
    • Algebra
    • Basic Math
    • Calculus
    • Geometry
    • Linear Algebra
    • Pre-Algebra
    • Pre-Calculus
    • Statistics And Probability
    • Trigonometry
    • other →

    Top subcategories

    • Astronomy
    • Astrophysics
    • Biology
    • Chemistry
    • Earth Science
    • Environmental Science
    • Health Science
    • Physics
    • other →

    Top subcategories

    • Anthropology
    • Law
    • Political Science
    • Psychology
    • Sociology
    • other →

    Top subcategories

    • Accounting
    • Economics
    • Finance
    • Management
    • other →

    Top subcategories

    • Aerospace Engineering
    • Bioengineering
    • Chemical Engineering
    • Civil Engineering
    • Computer Science
    • Electrical Engineering
    • Industrial Engineering
    • Mechanical Engineering
    • Web Design
    • other →

    Top subcategories

    • Architecture
    • Communications
    • English
    • Gender Studies
    • Music
    • Performing Arts
    • Philosophy
    • Religious Studies
    • Writing
    • other →

    Top subcategories

    • Ancient History
    • European History
    • US History
    • World History
    • other →

    Top subcategories

    • Croatian
    • Czech
    • Finnish
    • Greek
    • Hindi
    • Japanese
    • Korean
    • Persian
    • Swedish
    • Turkish
    • other →
 
Profile Documents Logout
Upload
The Agile World: Obstacles and Challenges
The Agile World: Obstacles and Challenges

... – Ensure the team knows their Definition of Done – Do not take on work that has unmet dependencies ...
WBS
WBS

... • Can be created in a spreadsheet; numbering each level and sub-level (3-level WBS is shown in figure) • the project manager defines the key objectives first and then identifies the tasks required to reach those goals. • Indentation is used in outline form with WBS codes ...
General Foundry Example of PERT
General Foundry Example of PERT

... Project management can be used to manage complex projects. The first step in planning and scheduling a project is to develop the work breakdown structure. This involves identifying the activities that must be performed in the project. Each detail and each activity may be broken into its most basic c ...
The Practical Adoption of Agile Methodologies
The Practical Adoption of Agile Methodologies

... factors include poor team communications, lack of vision, poor stakeholder management and changing requirements while technology based problems are usually around hardware or software elements not working as expected and increasing costs or delivery timelines. Failure to follow good project manageme ...
certified practising project practitioner
certified practising project practitioner

...  how, when and why schedule identification, monitoring and reporting processes are implemented  the importance of the individual's contribution to the cost management process  concepts behind Work Breakdown Structure, dependencies, resource allocation, critical paths, Gantt charts and earned valu ...
Document
Document

... experienced and certified project managers. PMI is a global not-for-profit association for project management professionals that have presence in many countries including Malaysia. PMI has over 400,000 members worldwide and it was established in 1969 with headquarter outside Philadelphia, USA (PMI, ...
Project Scope Management
Project Scope Management

... the project scope statement, create the WBS, verify completion of the project deliverables, and control requests for changes to the project scope  Key inputs include the project charter, preliminary scope statement, and project management plan  It should be reviewed with the project sponsor to mak ...
Project Change Control System Development
Project Change Control System Development

... Project Name: Prepared by: Date: Name of Product: Name of Phase, if applicable: Name of Specific Deliverable, if applicable: Name of Client or Sponsor: Statement of Formal Acceptance: The undersigned formally accept as complete the above-identified product, project phase, or major deliverable and do ...
PHRM revision by Hassan Daud (PowerPoint)
PHRM revision by Hassan Daud (PowerPoint)

... provide a way of showing high-level areas of responsibility ...
74-1 - Florida Administrative Code
74-1 - Florida Administrative Code

... interface, switch, or disseminate information of any kind or form as defined in Section 282.0041(11), F.S. 19. Issue ‒ A point or matter in question or in dispute, or a point or matter that is not settled and is under discussion or over which there are opposing views or disagreements. Definition fro ...
Outlines 041814 - Logical Operations
Outlines 041814 - Logical Operations

... This ILT Series course teaches students basic project-management techniques, including managing time and costs. Students will identify the features and attributes of a project, the steps and variables of the project management process, the effects of environmental, socioeconomic and organizational s ...
Diane Strode Agile Methods An Unexpected Journey
Diane Strode Agile Methods An Unexpected Journey

... • Depends on the organisation’s ability to be flexible in their implementation of governance processes... “Agile thought leaders have not provided much clear or detailed guidance about scaling Agile practices to the enterprise level, where many governance issues are ready to pounce. To make Agile wo ...
BMCF
BMCF

... 2.2 Work Breakdown Structure (WBS) *****  Definition – A WBS is a deliverable oriented grouping of project elements that organizes and defines the total scope of the project. WORK NOT IN THE WBS IS OUTSIDE THE SCOPE OF THE PROJECT.  A WBS is presented in chart form (similar to a spreadsheet) where ...
Budget Baseline 202.4 KB
Budget Baseline 202.4 KB

... The baseline may be separated into multiple sub-accounts. The baseline is primarily used at the business level. This baseline shows all expenses and investments for a project. This baseline is normally meant to span one fiscal year. The baseline is primarily used at the functional department level. ...
Defining the Critical Path
Defining the Critical Path

... The critical path is defined as the longest path through the CPM network and consists of those activities that determine the shortest time for project completion. Activities within this or list form a series (or sequence) of logically connected activities that is called the critical path. A delay to ...
project managers
project managers

... Thomas A. Stewart, The Corporate Jungle Spawns a New Species: The Project Manager”, Fortune, July, 10, 1995, pp 179-180. ...
heizer_om11_irm_ch03
heizer_om11_irm_ch03

... This slide identifies typical steps involved in project planning. A work breakdown structure defines the project by dividing it into its major subcomponents (or tasks), which are then subdivided into more detailed components, and finally into a set of activities and their related costs. Slides 20-23 ...
The Agile Release - Project Insight Downloads
The Agile Release - Project Insight Downloads

... Expand your knowledge of more complex tools and techniques Build leadership skills to manage people more effectively Identify practical ways to begin using advanced ...
Introduction to Project Management
Introduction to Project Management

... Portfolio Management A program is “a group of related projects managed in a coordinated way to obtain benefits and control not available from managing them individually” (PMBOK® Guide, Fifth Edition, 2012) ...
Guidance on the use of a baseline skillset for
Guidance on the use of a baseline skillset for

... We recognise though that there is no one-size-fits-all prescription to make sure this happens. It is clearly not reasonable to expect an organisation which is an occasional procurer of relatively straightforward construction work to retain the same in-house capability and capacity as one which is a ...
Unit 10 – Network Logic and Scheduling
Unit 10 – Network Logic and Scheduling

... Useful for  Creating milestone charts  Positioning activities to eliminate excessive float ...
Томский политехнический университет Проектный менеджмент
Томский политехнический университет Проектный менеджмент

... external consultants and the client have to cross the organizational boundary. This boundary represents a barrier to effective communication. – Team allegiance tends to be lower in external structures. The objectives of the external consultants do not correspond to the objectives of the client, and ...
Project quality management (PMI body of knowledge)
Project quality management (PMI body of knowledge)

... 1) Quality Management Plan  The Quality Plan should address: - Quality Control of the project - Quality Assurance - Quality Improvement of the project Note: the project quality plan can be highly detailed or broadly framed based on the needs of the project ...
Project Management
Project Management

... • It is quite difficult to create a good scope statement and WBS for a project • It is even more difficult to verify project scope and minimize scope changes • Scope verification involves formal acceptance of the completed project scope by the stakeholders • Acceptance is often achieved by a custome ...
International Legal Project Management
International Legal Project Management

... University of Brussels (License spéciale avec Grande Distinction) and in International Law from the University of Bristol (LL.M.) under academic scholarship from the A. Onassis Foundation. He has been the head of international legal teams and a key expert in several major energy-related projects of ...
< 1 2 3 4 5 6 ... 11 >

Earned value management

Earned value management (EVM), or Earned value project/performance management (EVPM) is a project management technique for measuring project performance and progress in an objective manner.