• Study Resource
  • Explore
    • Arts & Humanities
    • Business
    • Engineering & Technology
    • Foreign Language
    • History
    • Math
    • Science
    • Social Science

    Top subcategories

    • Advanced Math
    • Algebra
    • Basic Math
    • Calculus
    • Geometry
    • Linear Algebra
    • Pre-Algebra
    • Pre-Calculus
    • Statistics And Probability
    • Trigonometry
    • other →

    Top subcategories

    • Astronomy
    • Astrophysics
    • Biology
    • Chemistry
    • Earth Science
    • Environmental Science
    • Health Science
    • Physics
    • other →

    Top subcategories

    • Anthropology
    • Law
    • Political Science
    • Psychology
    • Sociology
    • other →

    Top subcategories

    • Accounting
    • Economics
    • Finance
    • Management
    • other →

    Top subcategories

    • Aerospace Engineering
    • Bioengineering
    • Chemical Engineering
    • Civil Engineering
    • Computer Science
    • Electrical Engineering
    • Industrial Engineering
    • Mechanical Engineering
    • Web Design
    • other →

    Top subcategories

    • Architecture
    • Communications
    • English
    • Gender Studies
    • Music
    • Performing Arts
    • Philosophy
    • Religious Studies
    • Writing
    • other →

    Top subcategories

    • Ancient History
    • European History
    • US History
    • World History
    • other →

    Top subcategories

    • Croatian
    • Czech
    • Finnish
    • Greek
    • Hindi
    • Japanese
    • Korean
    • Persian
    • Swedish
    • Turkish
    • other →
 
Profile Documents Logout
Upload
Critical load protection from the world`s largest three phase UPS
Critical load protection from the world`s largest three phase UPS

lab equipment overview
lab equipment overview

... should be noted that although DC lab bench supplies often contain an internal meter indicating the supply's DC output voltage and/or current, the internal meter is typically not extremely accurate: the output voltage should be adjusted using an accurate multimeter if the circuit requires a specific ...
CC Series Ultra High Capacity Emergency spec sheet
CC Series Ultra High Capacity Emergency spec sheet

... perform all tests required by UL924, and NFPA 101. The system indicates the status of the exit at all times using the LED indicator near the test switch on the side of the unit. A 90-minute battery power (emergency mode) simulation test will occur randomly once every six months. A 30 second battery ...
Document
Document

... maximum output power considering the conduction losses in the boost converter. The boost converter was implemented in a 0.13μm CMOS process. The output voltage can be boosted from 20 mV input which is the open voltage of TEG of 1.5 Ω source resistance. The measurement results show that the output po ...
Kostakis-etal-EST2017-Fast-acting-protection-as-a-key-enabler
Kostakis-etal-EST2017-Fast-acting-protection-as-a-key-enabler

... In comparison to faults within AC systems, DC system faults can present very demanding protection challenges with regards to fault current magnitude and propagation speed [42][43]. To mitigate these issues, converter designs have evolved to provide more fault ride-through capabilities and current li ...
EM24 DIN
EM24 DIN

... ● Not-certified version available (option X): see “how to order” on the next page. ...
generalized fryze control strategy for shunt and
generalized fryze control strategy for shunt and

HAM Gear Sale List - for Local HAM Ops DAVE LUCHAK KL7BX
HAM Gear Sale List - for Local HAM Ops DAVE LUCHAK KL7BX

... All RADIOS can be demonstrated in your presence, as proof of respective condition, if need be. TUNERS can be demonstrated if I still have a compatible RADIO available to use as the testing rig. I either HAVE hard copy or CAN PROVIDE soft copies of User Manuals for items I am selling. All radios incl ...
Aalborg Universitet
Aalborg Universitet

... simulated in this paper. On top of DBS management backbone, two additional enhancements have been implemented; 1) feedforward compensation of HEV charging current and 2) reactive power controller that enhances local voltage conditions. The paper is organized as follows. Section II reveals the configu ...
grid integration of offshore wind farms using multi
grid integration of offshore wind farms using multi

... coupled to the frequency, any mismatch between the generation and demand may cause the system frequency to rise or decrease, depending on the net difference between generation and demand. Similarly, voltage relates to the reactive power balance. The network sees any disturbance and fault as the incr ...
Electricity and Magnetism
Electricity and Magnetism

... Green power is a cleaner alternative energy source in comparison to traditional sources, and is derived from renewable energy resources that do not produce any nuclear waste; examples include energy produced from wind, water, solar, thermal, hydro, combustible renewables and waste. Electricity from ...
Open FMB - Smart Grid Interoperability Panel
Open FMB - Smart Grid Interoperability Panel

... Frequency Control during island (based on EPRI Usecase) Limit maximum real power output at the PCC to a preset value (IEC TC8 WG6 DCT 4 Version 9) Provide dynamic reactive power injection through autonomous responses to local voltage ...
5.6 A 0.68nW/kHz Supply-Independent Relaxation Oscillator with
5.6 A 0.68nW/kHz Supply-Independent Relaxation Oscillator with

... challenges and RO designs have limited voltage and temperature (V-T) stability. RxOs generate a clock whose time period (TP) depends only on the timing resistor (R) and capacitor (C). Ideally, TP is independent of V-T; however, most RxOs use a reference voltage (VREF) against which the voltage of C ...
A Single Stage High Power Factor 3 Phase 60v/100a
A Single Stage High Power Factor 3 Phase 60v/100a

... High power factor (HPF) three-phase power supplies have been usually implemented by means of multiple switched stages. The first one is almost always a pre-regulator rectifier stage with high voltage level at its output (-4OOV) [1,2,3,4]. In order to obtain an isolated, regulated and low level outpu ...
Surges Harm ATS and Inverters
Surges Harm ATS and Inverters

... Figure  3  shows  a  typical  example  of  damage  caused  by  transients  on  data  lines.  A  network   switch  is  seemingly  operating  smoothly,  until  it’s  not.  The  culprits  are  high-­‐speed  transients  caused  by   differenc ...
- Premier University of Technology
- Premier University of Technology

... machines. Three phase synchronous and induction machines; two-phase servo motor; single phase induction motor. Smouth-rotor twophase doubly excited machine. Smoothair gap two-phase synchronous machine. Two-phase induction machine. The n-m winding symmetrical machine. Diagonalization by change of var ...
AG Series auto-reset-instructions-8-02.p65
AG Series auto-reset-instructions-8-02.p65

... AG Series sensors work in the same environment as motors, contactors, heaters, pull-boxes, and other electrical enclosures. They can be mounted in any position or hung directly on wires with a wire tie. Just leave at least one inch distance between sensor and other magnetic devices. Run all current ...
Power Factor Correction in Battery Chargers
Power Factor Correction in Battery Chargers

switched reluctance motor
switched reluctance motor

...  speed of the switched reluctance rotor .  speed and the torque are controllable .  Rotor is chasing current. ...
ARTICLE REVIEWS
ARTICLE REVIEWS

... Even with the key out of the ignition, this particular circuit is still powered and, when subjected to inquisitive fingers or spare change, a cause for concern. With only 12 volts present the electrical shock hazard is low, but a coin dropped into the outlet would create a spark before the fuse burn ...
Olsun Electrics
Olsun Electrics

... The transformer or reactor is to be installed in accordance with Article 450 of the National Electric Code. (a) The transformer or reactor must be installed in a well ventilated area free from: 1. Explosive or corrosive gases 2. Explosive vapors and dust 3. Excessive dust, dirt and moisture (b) Prop ...
What is New in Paladin DesignBase 4.0  Power Analytics Corporation
What is New in Paladin DesignBase 4.0 Power Analytics Corporation

A Mathematical Model to Choose Optimal Subsynchronous
A Mathematical Model to Choose Optimal Subsynchronous

Q4502102105
Q4502102105

... has some ability to control stability,but none to flow active power flow. The svc uses thyristor valves to rapidly add or remove shunt connected reactors and\or capacitors ,often in coordination with mechanically reactors and\or capacitors. The Static Var Compensator (SVC) is a shunt device of the F ...
Electric pulse Magnetic Braking (EPM
Electric pulse Magnetic Braking (EPM

... D.C. is send to the armature of the power pack, which is fitted to both the axles. This is sensed by the microprocessor through the sensors. The torque is sufficient to bring the vehicle to a rolling stop within a short distance since we apply only pulsating D.C., there is neither sliding nor skiddi ...
< 1 ... 877 878 879 880 881 882 883 884 885 ... 1128 >

Power engineering



Power engineering, also called power systems engineering, is a subfield of energy engineering that deals with the generation, transmission, distribution and utilization of electric power and the electrical devices connected to such systems including generators, motors and transformers. Although much of the field is concerned with the problems of three-phase AC power – the standard for large-scale power transmission and distribution across the modern world – a significant fraction of the field is concerned with the conversion between AC and DC power and the development of specialized power systems such as those used in aircraft or for electric railway networks. It was a subfield of electrical engineering before the emergence of energy engineering.Electricity became a subject of scientific interest in the late 17th century with the work of William Gilbert. Over the next two centuries a number of important discoveries were made including the incandescent light bulb and the voltaic pile. Probably the greatest discovery with respect to power engineering came from Michael Faraday who in 1831 discovered that a change in magnetic flux induces an electromotive force in a loop of wire—a principle known as electromagnetic induction that helps explain how generators and transformers work.In 1881 two electricians built the world's first power station at Godalming in England. The station employed two waterwheels to produce an alternating current that was used to supply seven Siemens arc lamps at 250 volts and thirty-four incandescent lamps at 40 volts. However supply was intermittent and in 1882 Thomas Edison and his company, The Edison Electric Light Company, developed the first steam-powered electric power station on Pearl Street in New York City. The Pearl Street Station consisted of several generators and initially powered around 3,000 lamps for 59 customers. The power station used direct current and operated at a single voltage. Since the direct current power could not be easily transformed to the higher voltages necessary to minimise power loss during transmission, the possible distance between the generators and load was limited to around half-a-mile (800 m).That same year in London Lucien Gaulard and John Dixon Gibbs demonstrated the first transformer suitable for use in a real power system. The practical value of Gaulard and Gibbs' transformer was demonstrated in 1884 at Turin where the transformer was used to light up forty kilometres (25 miles) of railway from a single alternating current generator. Despite the success of the system, the pair made some fundamental mistakes. Perhaps the most serious was connecting the primaries of the transformers in series so that switching one lamp on or off would affect other lamps further down the line. Following the demonstration George Westinghouse, an American entrepreneur, imported a number of the transformers along with a Siemens generator and set his engineers to experimenting with them in the hopes of improving them for use in a commercial power system.One of Westinghouse's engineers, William Stanley, recognised the problem with connecting transformers in series as opposed to parallel and also realised that making the iron core of a transformer a fully enclosed loop would improve the voltage regulation of the secondary winding. Using this knowledge he built a much improved alternating current power system at Great Barrington, Massachusetts in 1886. In 1885 the Italian physicist and electrical engineer Galileo Ferraris demonstrated an induction motor and in 1887 and 1888 the Serbian-American engineer Nikola Tesla filed a range of patents related to power systems including one for a practical two-phase induction motor which Westinghouse licensed for his AC system.By 1890 the power industry had flourished and power companies had built thousands of power systems (both direct and alternating current) in the United States and Europe – these networks were effectively dedicated to providing electric lighting. During this time a fierce rivalry in the US known as the ""War of Currents"" emerged between Edison and Westinghouse over which form of transmission (direct or alternating current) was superior. In 1891, Westinghouse installed the first major power system that was designed to drive an electric motor and not just provide electric lighting. The installation powered a 100 horsepower (75 kW) synchronous motor at Telluride, Colorado with the motor being started by a Tesla induction motor. On the other side of the Atlantic, Oskar von Miller built a 20 kV 176 km three-phase transmission line from Lauffen am Neckar to Frankfurt am Main for the Electrical Engineering Exhibition in Frankfurt. In 1895, after a protracted decision-making process, the Adams No. 1 generating station at Niagara Falls began transmitting three-phase alternating current power to Buffalo at 11 kV. Following completion of the Niagara Falls project, new power systems increasingly chose alternating current as opposed to direct current for electrical transmission.Although the 1880s and 1890s were seminal decades in the field, developments in power engineering continued throughout the 20th and 21st century. In 1936 the first commercial high-voltage direct current (HVDC) line using mercury-arc valves was built between Schenectady and Mechanicville, New York. HVDC had previously been achieved by installing direct current generators in series (a system known as the Thury system) although this suffered from serious reliability issues. In 1957 Siemens demonstrated the first solid-state rectifier (solid-state rectifiers are now the standard for HVDC systems) however it was not until the early 1970s that this technology was used in commercial power systems. In 1959 Westinghouse demonstrated the first circuit breaker that used SF6 as the interrupting medium. SF6 is a far superior dielectric to air and, in recent times, its use has been extended to produce far more compact switching equipment (known as switchgear) and transformers. Many important developments also came from extending innovations in the ICT field to the power engineering field. For example, the development of computers meant load flow studies could be run more efficiently allowing for much better planning of power systems. Advances in information technology and telecommunication also allowed for much better remote control of the power system's switchgear and generators.
  • studyres.com © 2025
  • DMCA
  • Privacy
  • Terms
  • Report