DURAID AL GAFARI
10146 Mountair Ave ▪ Tujunga ▪ CA 91042▪ (818) 296-8480 ▪ zaini_trd@yahoo.com
Years of Experience From 1993 To Date:
 AT United State – California – Los Angeles:
Since 08/25/2014 on the CITY OF GLENDALE CALIFORNIA - PUBLIC WORKS
DEPARTMENT up to date, and from 10thOct 2013 as a Professional Construction
Superintendent with LOS ANGELES UNIFIED SCHOOL DISTRICT (LAUSD) up to
08/01/2014.
 Out of United State:
Six Years as a Professional Project Manager for building High Rise Buildings
(RESIDENTIAL, COMMERCIAL BUILDINGS). Four Years as Estimating Engineer.
More than Three Years as a professional Construction Manager (FIVE STARS
HOTELS). Two Years as Project Engineer, for building (Commercial Buildings). Four
Years as Site Engineer for Civil works in Buildings and Infrastructure at (Gas Station &
Gas Factory).
EDUCATION
 Bachelor of Science in Civil Engineering
 1988 -1993 University Of Baghdad / Civil Engineering College – Iraq
 Member of the Iraqi Engineers’ Union - since 1993.
 FE/ EXAM under process.
 PCM Under process.
WORK EXPERIENCE
1. CITY OF GLENDALE, CALIFORNIA - PUBLIC WORKS DEPARTMENT,
ENGINEERING DIVISION - 633 EAST BRODWAY
 Supervisor: - PM/SM - Hagop Kassabian – (818) 937- 8211
hkassabian@glendaleca.gov
 Project Manager from 25th Aug. 2014 up to dat
 Glendale Central Library Renovation Project - 222 EAST HARVARD STREET,
GLENDALE, CA 91205.
I performed as “Assistant Project Manager” to renovate the Building of Glendale
Central Library Renovation the work generally includes; Structural Improvement,
HAVC and Plumbing Improvement, Life Safety, Maintenance, Historic Preservation,
Furniture, Accessibility, Landscape with Total Building area 89,688 S.F.
2. LOS ANGELES UNIFIED SCHOOL DISTRICT (LAUSD)
J.Yessaian Construction Inc. CA – LA – United State, (818) 256 7078 –hyessaian@yahoo.com.
 Construction Project Superintendent
 Period From 10th Oct. 2013 – 1st Aug.
2014
I performed as Construction Superintendent with the Company at Los Angeles Unified School District
LAUSD school construction in Existing Facilities. Responsibilities includes management of multiple Los
Angeles Unified School, Managing all construction site activities in projects for LAUSD as a General
contractor's representative, supervise superintendents & administrative crews coordination between
different parties (Architects/Engineers, Inspectors, Management representatives (OAR) &
Subcontractors), Review submittals in for compliance with the requirements of the contract documents
prior to submittal to the Architect built drawings, warranties, etc.
3. DUBAI – UNITED ARAB EMIRATES – High Rise Buildings: (RESIDENTIAL & COMMERCIAL BUILDINGS)
 BU HALEEBA CONTACTING
 Project manager, From July 2007 To Sept 2013
Project Start on May 2012 till immigrated to US on Sept 2013: 
I Performed as Project Manager to Construct the Residential Building (4 Basements as Parking
area + Ground Floor +22 Residential Floors (Eight Apartments each Floor) + Health Club
Floor (GYM, SWIMMING POOL, STEAM, SAUNNA,) + Roof) and Al Nujoom Tower
Building has Landscape area all around and it is located at Al Qusais Area – Dubai - UAE, the
Project Cost was 155,000,000 UAE Dirhams, around (US $ 42,192,370), with Total area 75,400
SF.
Project Start from April 2010 to April 2012: 
I Performed as Project Manager to Construct the Commercial Building (4 Basements as Parking
Area + Ground Floor+10 Floor Offices + Health Club Floor (GYM, SWIMMING POOL,
STEAM, SAUNNA,) + Roof) the Building was belong to the Government Authority the
Securities & Commodities Authority in Al Garhoud Area – Dubai- UAE, and the Project Cost
was 120,000,000 UAE Dirhams around (US $ 32,665,061), with Total area 20,000 SF.
Project Start from Sept 2009 to March 2010: 
I Received the Project as Project Manager from Sept 2009 to March 2010 to complete the
handing over the Building to the Al Thuraya Telecommunications Tower as Government
Building at Dubai- UAE the Commercial Building (2 Basement as Parking Area + Ground
Floor +15 Offices Floor + Roof), and the Project cost was 135,000,000 UAE Dirhams around
(US $ 36,748,193), with Total area 21,500 SF.
Project Start from July 2007 to Sept 2009: 
I Performed as Project Manager to construct Two Buildings in Al Nasr Plaza (Residential &
Commercial) High Luxury Buildings in Oud Metha area Bar Dubai - UAE, and the Project
was included Two building the 1st Building is Residential Building have 85 Apartments,
2nd Building is Commercial Building Have 100 Offices .The Project Cost was 146,000,000
UAE Dirhams, around (US $ 39,742,490), with Total area 86,100 SF.
4. Peremba Construction SDN. BHD - PECD (Dubai- UAE)
Position: Construction Manager. (Nov 2006 To June 2007)

I performed for Peremba Construction SDN. BHD - PECD to construct AL FATTAN
TOWER PLOT NO. GB-02 DIFC - DUBAI, which is including Two Luxury Buildings (4
Basements as (Parking) + Ground Floor + 55 Residential (Apartments) Floors + Health
Club + Roof. And 4 Basements as (Parking) + Ground Floor + 11 Floors as Offices +
Roof, in Construction Department as a Construction Manager. Project Cost 800,000,000
UAE Dirhams around (US $ 217,767,071), with Total area 107,600 SF.

5. Cornthia Group (Corinthia Construction Overseas Limited - CCOL)
Position:
 Construction Manager.
 Estimating Engineer
(From Jan 2000 To May 2002)
(From June 2002 To Aug 2006)
Project Start from Jan 2000 to May 2002
 I performed for Cornthia Hotel Company to Build Corinthia Bab Africa Hotel at Tripoli – Libya,
(Five Stars Hotel) which is including Two Towers 30 Floors and 15 Floors and supplementary
Buildings (220 Rooms + 79 Suites + Royale Suite + Health Club (SPA, Swimming Pool) +
Roof), in Construction Department as Construction Manager and the Project Cost was
250,000,000 US $, with Total area 215,280 SF.
Project Start from June 2002 to Sept 2004
 I Performed as Estimating Engineer to build New Five Stars Hotel in Portugal-Lisboa, which are
including 25 Floor (Rooms & Suites), and the Project Cost was180, 000,000 US $, with Total
area 110,600 SF.
Project Start from Nov 2004 to Dec 2005
 I Performed as Estimating Engineer to build New Five Stars Hotel in Malta, which are including
35 Floor (Rooms & Suites), and the Project Cost was150, 000,000 US $, with Total area
107,600 SF.
Project Start from Dec 2005 to June 2006
 I performed as Estimating Engineer to build New Five Stars Hotel, in Sudan, which are
including 30 Floors (Rooms & Suites), and the Project Cost was 200,000,000 US $, with Total
area 162,000 SF.
6. Al Adwaa Construction Co Ltd (Tripoli – Libya)

Position: Project Engineer
The Project Start from March 1998 to Dec 1999

I performed for a large Civil Engineering Contractor to build public Commercial Building.
The Project was 10 Floors as Offices, where I participated with Structural analysis and
Concrete Design, after that, I gained experience in carrying out this Project as Project
Engineer by participating with the Estimated the costs of the Project and review the
documents. The Project Cost was (US $ 6,000,000.00), with Total area 10,700 SF.
7. Al Nahrawn Co LTD (Baghdad – Iraq)

Position: Site Engineer
The Project Start from Oct 1993 to Sept 1997

•
•
I was responsible and performed for Al Nahrawan Company (General Contractor) as a
Site engineer employed on site in setting out works for heavy engineering projects in
Constructions in Iraq. Also I gained good experience on concrete water tanks and
Petroleum Structures.
Gas Stations: executing Gas Stations in Baghdad
Gas Factory: executing Gas Factory in Al Latifyai (25) Km far of western Baghdad.
LANGUAGES:
- ARABIC & ENGLISH
ENGINEERING SOFTWARE:
- AUTOCAD,
PROJECT MANAGEMENT SOFTWARE:
- MS-PROJECT, PRIMAVERA
COMMON SOFTWARE:
- WORD, EXCEL, ETC.
DURAID AL GAFARI
B.S Civil Eng.