Download Qualification of Key Personnel - PHIVIDEC Industrial Authority

Survey
yes no Was this document useful for you?
   Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Transcript
PHIVIDEC Industrial Authority
BAC 2016
CONSTRUCTION OF BANK PROTECTION (GABIONS)
ALONG DIVERSION CANAL
SF-INFR-48
Qualification of Key Personnel Proposed to be Assigned to the Contract
Business Name
:
Business Address
:
Project Manager /
Engineer
Materials Engineer
Foreman
Construction Safety and
Health Personnel
1. Name
2. Address
3. Date of Birth
4. Employed Since
5. Experience
6. Previous Employment
7. Education
8. PRC License
Minimum Requirements
: Project Manager / Engineer
: Materials Engineer
: Foreman
: Foreman
Note
: Attached individual resume and PRC License of the (Professional) personnel.
Submitted by
: __________________________
(Printed Name & Signature)
Designation
Date
: __________________________
: __________________________
Other positions deemed
required by the Applicant
for this project
PHIVIDEC Industrial Authority
SF-INFR-48
BAC 2016
CONSTRUCTION OF BANK PROTECTION (GABIONS)
ALONG DIVERSION CANAL
Similar
Liang-Hhuo Tu
Liang-Hhuo Tu