Survey
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
WASTEWATER TREATMENT PLANT IMPROVEMENTS, CONTRACT II VERSAILLES, KENTUCKY OWNER City of Versailles Contact: Jerry Campbell Telephone: 859-873-3624 ARCHITECT-ENGINEER Proctor/Davis/Ray Consulting Engineers 800 Corporate Drive Lexington, Kentucky 40503 Contact: Paul Danheiser Telephone: 859-223-8000 % SELF PERFORMED: ±75% PROJECT This project involved the construction of a 3.0 million gallon per day Extended Aeration Wastewater Treatment Facility. The project required construction of a Concrete Influent Structure, Oxidation Ditches, Final Clarifiers, Chlorine Contact Basin, RAS/WAS Pump Station, and Effluent structure. A new Operations Building and Laboratory were also constructed. In addition to the new construction, modifications were performed to the existing plant Influent Structure to divert the flow to the new Screening Structure. The existing Primary and Secondary Clarifiers were converted to Aerated Sludge Holding Tanks. ENGINEERS ⋅ CONTRACTORS/CONSTRUCTION MANAGERS ⋅ ENVIRONMENTAL CONSULTANTS